Electrical and mechanical design and construction of a new Australian High Commission complex at Tarawa. Includes solar power collection with battery storage and diesel generator back up, inter-connected with the local mains power supply. Power distribution, switchboards and ups units. Air conditioning and ventilation, communications and security access, monitoring and detection.
A new jet fuel storage and dispensing facility, being part of a major expansion to the Tindal air force base. Electrical installations within hazardous areas and extensive power reticulation and control systems. Switchboards, SCADA, PLC, Fuel Management, Load Controllers, Computers and Servers, Lightning and Cathodic Protection.
Upgrade of numerous wharfs throughout the South Pacific nations to facilitate the docking of naval vessels. Including new power supplies, switchboards, lighting and cope pedestals with flexible cable connections between the wharf and the ship.
Supplying power to 3 new prefabricated buildings which will be the new Australian High Commission complex in Funafuti. Includes a solar, battery and generator system for the site to be fully self powered.
Electrical and mechanical design and construction of a number of new buildings at the Kiribati Institute of Technology and Youth Learning Centre in Betio. Includes a diesel backup generator inter-connected with the local mains power supply. Lighting and power, air conditioning, communications and security.
A new humanitarian warehouse in Kiribati. Power supply to site (including both solar and PUB connections), lighting, power and communications.