Installation of electrical and instrumentation equipment for the three new water treatment plants, including switchboards and motor control centres, UPS and standby power supplies. Field devices and computerised operating and monitoring controls.
New water treatment plant incorporating high and low voltage overhead and underground reticulation systems. Installation of transformer, mains power supply, switchboards, lighting, general power, PLC control systems and remote telemetry interfacing.
Main switchboards, PF correction, mains cables, bus duct, cable supports, battery charging, dock loading, internal and external lighting, standby power generation, freezer room installations and refrigeration plant electrical mains & controls.
The complete design and installation of the electrical reticulation, switchboards, generator, telephone cabling, internal and external lighting, general and special power supplies. The mechanical air conditioning and battery charging exhaust systems.
Extension to the Big W main distribution centre for W.A., N.T. & S.A., incorporating main switchboards, PF correction, mains cables, bus duct, cable supports, electronic dimming, battery charging, dock loading, internal and external lighting, security and BMS.
Installation for a new pressing, fermenting and processing plant, including mains cable reticulation, stainless steel switchboards and upgrades, PLC and automation controls, general power, data and lighting. Installation to exposed industrial standards.
D & C of a totally automated system for four 280KW pump sets and 10ML water tanks. Consisting of consumer’s mains, switchboards, Scada, PLC, pump, control, instrumentation cabling and devices, telemetry system, security system and light & power.
New facility for unloading of coal trucks into crushing plant incorporating relocation and upgrading existing cabling and supports, conveyor controls, motor drives, switchboards, marshalling boxes, field devices and area lighting.