Mining Projects
Moorevale Mining Camp – Qld
Design of a 600 single person accommodation facility. Including a 3000amp main switchboard with automatic generator transfer. Extensive site power reticulation, distribution boards and path lighting. Internal power, lighting and fire detection.
Coppabella Mining Camp – Qld
The supply and installation of a five tier 11kV switchboard complete with automatic standby power changeover, metering and protection. 11kV underground cable reticulation to seven padmount substations, a step-up and an auxiliary transformer.
Mine Sites Newman & Yandi – WA
Design and documentation of sampling laboratory. Installation of main power supplies reticulation and main switchboards. Distribution boards, submain cables, uninterrupted power supply, earthing, internal and area lighting, general and special power outlets.
Fosterville Gold – Bendigo Vic
Installation of a 21 tier 11kv HV switchboard and cable reticulation to five main substations. Distribution and auto transformers, LV switchboards and motor control panels. Extensive cable ladder system, field device cabling and instrumentation.
Goro Nickel Mine Camp – New Caledonia
Construction workers site accommodation, messing and recreation facility, incorporating site power reticulation, switchboards, earthing, fire detection and internal wiring and fit out of the buildings electrical systems, to the French New Caledonia standards.