High Voltage Projects

Johnston Subdivision Stage 2A-1 – NT

New subdivision, including high voltage substations and switchgear, earthing, high and medium voltage underground cable reticulation, termination pillars,street lighting poles and luminaires.

Alice Springs Hospital HV – NT

Installation of two 1,500 kVA 11kV power transformers and new underground 11kV cable from an existing 11kv ring main unit. Disconnect existing 11kv ring main and connect in the new 11kv cable and the two transformers. Test and commission.

Coppabella Mining Camp – Qld

The supply and installation of a five tier 11kV switchboard complete with automatic standby power changeover, metering and protection. 11kV underground cable reticulation to seven padmount substations, a step-up and an auxiliary transformer.

Mt Morgan Water Treatment Plant Qld

New water treatment plant incorporating high and low voltage overhead and underground reticulation systems. Installation of transformer, mains power supply, switchboards, lighting, general power, PLC control systems and remote telemetry interfacing.

Cairns Airport HV Cable – Qld

Installation of a new 1.4kilometre 22kV high voltage cable feeder from the Ergon substation to the airport central substation. Including trenching, underboring, concrete pits, spare HD and communications conduits, traffic & environmental management.

Traeger Park Main Oval Lighting – Alice Springs NT

NECA Award of Excellence 2004

Design and install 4no. 52 metre lighting towers, capable of accommodating 352no. 2Kw luminaires. Including concrete footings, trenching, switchboards, high & low voltage distribution, temporary power generation, data logging & C bus controls. Surveying and aiming of lights for AFL television coverage.

Fosterville Gold – Bendigo Vic

Installation of a 21 tier 11kv HV switchboard and cable reticulation to five main substations. Distribution and auto transformers, LV switchboards and motor control panels. Extensive cable ladder system, field device cabling and instrumentation.

Snowy Mountains HV & Fibre – NSW

NECA Award of Excellence 2004

The underground installation and termination of over 34 kilometre of high voltage and fibre optical cables, through the Mount Kosciusko National Park. Including extensive trenching in difficult terrain, climate and within fragile environmental areas.

Roxby Downs Subdivision – SA

New area subdivisions, including high voltage substations and switchgear, earthing, overhead high voltage power lines, high and medium voltage underground cable reticulation, termination pillars, street and path lighting poles and luminaires.